Scenic address: Longzhouping Town, Changyang County, Yichang, Hubei Service Hotline:86 717-5335806

  About us  

5A level scenic area, national forest park, Hubei Grade A tourism resource area,
One of the ten core tourist attractions in the Western Hubei Circle

Details

Geheyan Dam

The main project of Geheyan Hydropower Station on Qingjiang River is the dam with a length of 684 meters, an elevation of 206 meters and a relative height of 151 meters. Geheyan Hydropower Station was started in January 1987. In November 1994, all four 1.2 million kilowatt-hour units generated electricity, which lasted for eight years. The dam has a maximum storage capacity of 3.4 billion cubic meters and annual power generation capacity of 3.04 billion degrees. It is one of the main peak shaving and frequency modulation power plants in Central China Power Grid.
没有此类产品
Attractions details
The main project of Geheyan Hydropower Station on Qingjiang River is the dam with a length of 684 meters, an elevation of 206 meters and a relative height of 151 meters. Geheyan Hydropower Station was started in January 1987. In November 1994, all four 1.2 million kilowatt-hour units generated electricity, which lasted for eight years. The dam has a maximum storage capacity of 3.4 billion cubic meters and annual power generation capacity of 3.04 billion degrees. It is one of the main peak shaving and frequency modulation power plants in Central China Power Grid.
"High Gorges out of Pinghu, mountains and rivers into the color map, Lake Bay drifting fishing songs, green trees full of hills and slopes". Today, the dam stands, Fuze Qianqiu, power generation, tourism, flood control, shipping, aquatic products... The vast waters of Geheyan Dam show us another harmonious ecological picture.
Corresponding parameter set not found, please add it in property template of background
暂未实现,敬请期待
暂未实现,敬请期待
Previous article
Next article